Screen shot 2015-05-01 at 3.16.16 PM

As part of Rising Tide Toronto‘s Earth Day Action to Stop Line 9, I illustrated a map showing how disastrous a pipeline failure would be for the city’s waterways.

Enbridge plans to have Line 9 operating by June, despite the fact that the legal challenge by the Chippewas of the Thames First Nation has yet to be heard in court and despite the City of Toronto’s recent motion requiring safety valves be installed to protect Toronto’s waterways.

Advertisements